# Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm

**Type:** Papers  
**Canonical URL:** https://scholariq.org/papers/bi-objective-multi-mode-resource-constrained-multi-project-scheduling-using/

## Facts

| Field | Value |
| --- | --- |
| Author Names | Hongbing Yang,Ziyang Wang,Yue Gao,Wei Zhou |
| Citations | 47 |
| DOI | 10.1016/j.asoc.2023.111201 |
| Fields | Decision Sciences,Engineering |
| Open Access | false |
| OA Status | closed |
| OpenAlex ID | https://openalex.org/W4390324363 |
| Type | article |
| Year | 2023 |

## Paper authors

- [Hongbing Yang](https://scholariq.org/researchers/hongbing-yang/)

## Paper primary topic

- [Decision Sciences](https://scholariq.org/topics/decision-sciences/)

## Paper topics

- [Scheduling and Optimization Algorithms](https://scholariq.org/topics/scheduling-and-optimization-algorithms/)

---
Source: ScholarIQ — public research metadata, principally OpenAlex. See https://scholariq.org/sources/ for provenance and https://scholariq.org/methodology/ for what these figures mean.
