# Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study

**Type:** Papers  
**Canonical URL:** https://scholariq.org/papers/engagement-of-facilities-management-in-design-stage-through-bim-framework-and-a/

## Facts

| Field | Value |
| --- | --- |
| Author Names | Ying Wang,Xiangyu Wang,Jun Wang,Ping Yung,Jun Guo |
| Citations | 198 |
| DOI | 10.1155/2013/189105 |
| Fields | Decision Sciences,Engineering,Psychology |
| Open Access | true |
| OA Status | gold |
| OA URL | https://downloads.hindawi.com/journals/ace/2013/189105.pdf |
| OpenAlex ID | https://openalex.org/W1977396215 |
| Type | article |
| Year | 2013 |

## Paper authors

- [Jun Wang](https://scholariq.org/researchers/jun-wang/)

## Paper primary topic

- [BIM and Construction Integration](https://scholariq.org/topics/bim-and-construction-integration/)

## Paper topics

- [BIM and Construction Integration](https://scholariq.org/topics/bim-and-construction-integration/)
- [Facilities and Workplace Management](https://scholariq.org/topics/facilities-and-workplace-management/)
- [Construction Project Management and Performance](https://scholariq.org/topics/construction-project-management-and-performance/)

---
Source: ScholarIQ — public research metadata, principally OpenAlex. See https://scholariq.org/sources/ for provenance and https://scholariq.org/methodology/ for what these figures mean.
