# Resource-constrained project scheduling problem: review of past and recent developments

**Type:** Papers  
**Canonical URL:** https://scholariq.org/papers/resource-constrained-project-scheduling-problem-review-of-past-and-recent/

## Facts

| Field | Value |
| --- | --- |
| Author Names | Farhad Habibi,Farnaz Barzinpour,Seyed Jafar Sadjadi |
| Citations | 144 |
| DOI | 10.5267/j.jpm.2018.1.005 |
| Fields | Decision Sciences,Engineering |
| Open Access | true |
| OA Status | diamond |
| OA URL | https://doi.org/10.5267/j.jpm.2018.1.005 |
| OpenAlex ID | https://openalex.org/W2783949260 |
| Type | article |
| Year | 2018 |

## Paper authors

- [Farnaz Barzinpour](https://scholariq.org/researchers/farnaz-barzinpour/)

## Paper journal

- [Journal of Project Management](https://scholariq.org/journals/journal-of-project-management/)

## Paper primary topic

- [Decision Sciences](https://scholariq.org/topics/decision-sciences/)

## Paper topics

- [Scheduling and Optimization Algorithms](https://scholariq.org/topics/scheduling-and-optimization-algorithms/)
- [BIM and Construction Integration](https://scholariq.org/topics/bim-and-construction-integration/)

---
Source: ScholarIQ — public research metadata, principally OpenAlex. See https://scholariq.org/sources/ for provenance and https://scholariq.org/methodology/ for what these figures mean.
